>
Aligion Icon
Energy

Self-sufficiency in

clean and

sustainable energy

Illustrative image of energy

Energy

Energy self-sufficiency has been a reality at Santa Maria since its inception. Currently, this condition is provided through three hydroelectric plants: Salto São Pedro Small Hydroelectric Power Plant, located in the Municipality of Pinhão, Salto Curucaca Hydroelectric Power Plant in Guarapuava, and Três Capões Novo Small Hydroelectric Power Plant. Together, they have a generation potential of up to 48 MW. This is equivalent to the amount needed to supply a city with approximately 200,000 inhabitants.

Image representing energy
Illustrative image of generating sources

Sources

Generating

Responsibility

Environmental

Clean and Sustainable Energy

Our entire electricity production process adheres to current socio-environmental responsibility standards, ensuring clean and renewable energy, while continuously striving to generate energy from renewable sources.

 

We value generation from renewable sources. Santa Maria’s energy potential is extremely important for maintaining the industry’s energy self-sufficiency. Its capacity also makes it possible to sell part of its generation to the market.

Image representing clean energy

Our entire electricity production process adheres to current socio-environmental responsibility standards, ensuring clean and renewable energy, while continuously striving to generate energy from renewable sources.

 

We value generation from renewable sources. Santa Maria’s energy potential is extremely important for maintaining the industry’s energy self-sufficiency. Its capacity also makes it possible to sell part of its generation to the market.

LEGAL DOCUMENTS FOR VIEWING

  • AUT. E LICENÇAS AMBIENTAIS VIGENTES - AA57671PCHTRÊSCAPÕESNOVO - PCH TRES CAPOES NOVO

  • AUT. E LICENÇAS AMBIENTAIS VIGENTES - LO_314163 - PCH TRES CAPOES NOVO

  • AUT. E LICENÇAS AMBIENTAIS VIGENTES - PORTARIA_16071_2022_OD-GOUT - PCH TRES CAPOES NOVO

  • RELATÓRIOS - ETAPA OPERAÇÃO - [PCH TCN] COMPENSAÇÃO_AMBIENTAL (ATENDIMENTO AO TERMO DE COMPROMISSO)_MONIT_PÓS-PLANTIO_V0 - PCH TRES CAPOES NOVO

  • RELATÓRIOS - ETAPA OPERAÇÃO - RELAT_SEMESTRAL_01_ (LO AGO2024) - PCH TRES CAPOES NOVO

  • RELATÓRIOS - ETAPA OPERAÇÃO - RELATORIO_FAUNA TERRESTRE E AQUÁTICA_CONSOLIDADO - C1-C10 - PCH TRES CAPOES NOVO

  • RELATÓRIOS ETAPA INSTALAÇÃO - RAS_COMPLEMENTACÃO_V0.- PCH TRES CAPOES NOVO

  • RELATÓRIOS ETAPA INSTALAÇÃO - RAS_COMPLEMENTACÃO_V0.- PCH TRES CAPOES NOVO

  • RELATÓRIOS ETAPA INSTALAÇÃO - RDPA_V0- PCH TRES CAPOES NOVO

  • RELATÓRIOS ETAPA INSTALAÇÃO - RELATÓRIO TRIMESTRAL_PBAS_LI_V0- PCH TRES CAPOES NOVO

  • RELATÓRIOS ETAPA INSTALAÇÃO - RELATÓRIO_PBAS_AA_V0- PCH TRES CAPOES NOVO